Construction Consultancy Services Framework
The University of Manchester wishes to establish a construction consultancy services framework consisting of a number of disciplines.
Architectural Services — Construction costs up to 2m GBP
The University of Manchester
Core Architectural Services, supplementary services may also include:
— Principal Designer,
— Interior Designer,
— Acoustic Engineer,
— DDA Access Consultant,
— Landscape Architect,
— Artificial Sports Surfaces Design,
— BIM Co-ordinator,
— BIM Information Manager,
— Building Control/Approved Inspector,
— Planning Consultant,
— Property Preservation Consultant,
— Heritage Consultant,
— Archaeology Consultant,
— Drainage Consultant,
— Topographical Surveys.
This lot covers architectural services for projects with a construction value up to 2m GBP.
Architectural Services Construction costs between 2 000 001 GBP to 10m GBP
— Workplace Design,
— BREEAM Assessor,
— BREEAM Accredited Professional,
— Façade Consultant,
— FF&E Consultant,
— Master Planner,
— Fire Engineer,
— Environment Consultant,
— Topographical Surveys,
— Technical Advisor (retained or appointed by Client for D&B).
Possible novation to one of the University’s Construction Framework Contractors for Design and Build contracts.
This lot covers architectural services for projects with a construction value between 2 000 001 GBP to 10m GBP.
Cost Consultancy Services — Construction costs up to 2m GBP
Core Cost Consultancy Services.
This lot covers cost consultancy services for projects with a construction value up to 2m GBP.
Cost Consultancy Services — Construction costs between 2 000 001 GBP to 10m GBP
Supplementary services may also include:
— Employer’s Agent.
This lot covers cost consultancy services for projects with a construction value between 2 — 10m GBP.
Project Management Consultancy Services — Construction costs up to 2m GBP
Core Project Management, Client Representative and combined Project Management/Client RepresentativeService.
This lot covers project management consultancy services for projects with a construction value up to 2m GBP.
Project Management Consultancy Services — Construction costs between 2 000 001 GBP to 10m GBP
Core Project Management, Client Representative and combined Project Management/Client Representative Service.
— Employers Agent,
— NEC Project Manager,
— NEC Supervisor.
This lot covers project management services for projects with a construction value between 2-10m GBP.
Project Management with full Design and Consultant Team Services Construction costs over 10m GBP but reserve the option to use on projects between 5m GBP — 10m GBP
Core Project Management and Cost Management Services with the procurement of Design Services after appointment of the PM/CM.
Design Services including:
— Architecture,
— Design Manager,
— Mechanical and Electrical,
— Energy Design Consultant,
— Civil/Structural Engineering,
— Lighting Design,
— AV and Sound System Design,
— Theatre Design,
— ICT Infrastructure Design,
— Security and Access Design,
— Utilities Design and Planning,
— Exhibition Designer,
— Workshop Designer,
— Specialist Geotechnical and Structural Services,
— Wind Engineering,
— Highways/Transport Engineer,
— Technical Advisor (designers retained or appointed by Client for D&B).
Possible novation of designers to one of the University’s Construction Framework Contractors for Design andBuild contracts supplementary services may also include:
— NEC Supervisor,
— Clerk of Works,
— Site Investigation (bore holes/trial holes).
Building Surveying Services — Construction costs up to 5m GBP
Core Building Surveying Services.
— Fire Engineer.
Mechanical and Electrical Engineering Services — Construction costs up to 2m GBP
Core M&E Engineering Service.
— BREEAM Accredited Professional.
Fees will generally be calculated on the M&E value within the construction cost.
This lot covers M&E services for projects with a construction value up to 2m GBP.
Mechanical and Electrical Engineering Services — Construction costs between 2 000 001 GBP to 10m GBP
This lot covers M&E services for projects with a construction value between 2-10m GBP.
Structural and Civil Engineering Services — Construction costs up to 10m GBP
Core Structural and Civil Engineering Service.
— Façade Engineer,
— Site Investigation (bore holes/trial holes),
Fees will generally be calculated on the SE/CE value within the construction cost for refurbishment projects. Fornew build projects, fees will be calculated on the construction cost.
NEC Supervisor Services — Construction costs over 5m GBP
Core NEC Supervisor Service.
Clerk of Works Services — Construction costs up to 10m GBP
Core Clerk of Works Service.
Architectural Services — Construction Costs up to 2 000 000 GBP
Architectural Services Construction costs between 2 000 001 GBP to 10 000 000 GBP
Cost Consultancy Services — Construction costs up to 2 000 000 GBP
Cost Consultancy Services — Construction costs between 2 000 001 GBP to 10 000 000 GBP
Project Management Consultancy Services — Construction Costs up to 2 000 000 GBP
Project Management Consultancy Services — Construction Costs between 2 000 001 GBP to 10 000 000 GBP
Project Management with full Design and Consultant Team Services Construction costs over 10 000 000 GBP but reserve the Option to use on Projects between 5 000 000 GBP — 10 000 000 GBP
Building Surveying Services — Construction Costs up to 5 000 000 GBP
Mechanical and Electrical Engineering Services — Construction Costs up to 2 000 000 GBP
Mechanical and Electrical Engineering Services — Construction Costs between 2 000 001 GBP to 10 000 000 GBP
Structural and Civil Engineering Services — Construction Costs up to 10 000 000 GBP
NEC Supervisor Services — Construction Costs over 5 000 000 GBP
Clerk of Works Services — Construction Costs up to 10 000 000 GBP